How to Write RAMS That Get Signed Off First Time
The common reasons principal contractors bounce RAMS back, and how to avoid them. For subbies tired of resubmitting.
- Make it site-specific. Put the actual site address, the area you're working in and the dates. A generic RAMS is the number one reason for rejection.
- Describe the job in order. The method statement should read like the job: arrive, set up, do the work, clear up. Short numbered steps.
- List the real hazards for this job. Not every hazard in construction, just the ones that apply, each with a risk rating before and after controls.
- Make the controls specific. "Take care" is not a control. "Tower scaffold erected by a PASMA-trained operative, inspected before use" is.
- Name the PPE and the plant. List PPE by task, and the plant and tools you'll bring.
- Cover emergencies. First aid, fire, rescue from height where it applies, and the nearest A&E.
- Show who's been briefed. A sign-off sheet with the names and signatures of everyone doing the work.
Ramsforge builds site-specific RAMS with the job steps, rated hazards, PPE and emergency procedures laid out. Add your site address and preview it free. No account needed, pay per document.
Generate my RAMSGeneral guidance only. Always follow the site rules and the principal contractor's instructions.