Ramsforge

Internal Strip-Out & Demolition RAMS Generator (UK)

Create a CDM 2015 compliant RAMS for internal strip-out and soft demolition work, covering asbestos awareness and structural safety, in under 2 minutes.

✓ CDM 2015 Compliant

Applicable Regulations

CDM Regulations 2015Control of Asbestos Regulations 2012Manual Handling Operations 1992

Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Undisclosed Asbestos-Containing Materials

Control: Check the asbestos survey/register before starting. Stop work immediately and isolate the area if suspect materials are disturbed.

Initial Risk: HighResidual Risk: Low
Hazard

Structural Instability from Removing Load-Bearing Elements

Control: Confirm with a structural engineer or site management which elements are load-bearing before removal. Install temporary propping prior to any structural strip-out.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling & Falling Debris

Control: Use chutes or skips for debris removal, segregate the drop zone, and team-lift heavy stripped-out components such as radiators and doors.

Initial Risk: HighResidual Risk: Low
Hazard

Dust Generation During Strip-Out

Control: Use dust suppression (damping down) and dust extraction on cutting/breaking tools, and wear an FFP3 mask throughout strip-out work.

Initial Risk: HighResidual Risk: Low
Hazard

Hidden Services in Walls & Floors

Control: Check for live electrical, gas and water services before breaking into walls or floors, isolating any services found before continuing.

Initial Risk: HighResidual Risk: Low

Required PPE

BS EN 397 Hard HatFFP3 Dust MaskCut-Resistant GlovesBS EN ISO 20345 Safety BootsBS EN 166 Safety Glasses

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover the risk of encountering asbestos during strip-out?

Yes. It includes a control requiring the asbestos survey to be checked before work starts, and a stop-work procedure if suspect materials are found, in line with the Control of Asbestos Regulations 2012.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.