Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Working on Live/Isolated Circuits

Control: Isolate and lock off the full installation at the consumer unit before starting. Test dead using a proved voltage indicator (GS38) before touching any conductor.

Initial Risk: HighResidual Risk: Low
Hazard

Chasing Walls & Lifting Floorboards (Hidden Services/Asbestos)

Control: Check for other services and any asbestos survey before chasing walls or lifting older floor coverings. Use dust extraction on chasing tools.

Initial Risk: HighResidual Risk: Low
Hazard

Working in Roof Voids & Under Floors

Control: Use adequate task lighting and lay crawl boards across joists. Keep a second person aware of the work location and expected duration.

Initial Risk: HighResidual Risk: Low
Hazard

Dust from Chasing Walls for Cabling

Control: Use dust extraction on chasing tools and wear an FFP3 mask when cutting chases into plaster or masonry walls.

Initial Risk: HighResidual Risk: Low
Hazard

Disruption to Occupants During a Live-In Rewire

Control: Agree a room-by-room sequence with the occupant, maintaining power to essential circuits where possible and confirming isolation times in advance.

Initial Risk: HighResidual Risk: Low

Required PPE

1000V Insulated GlovesBS EN 166 Safety GlassesFFP3 Dust MaskKnee PadsBS EN ISO 20345 Safety Boots

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover isolating the whole property during a rewire?

Yes. It includes full isolation and lock-out/tag-out steps at the consumer unit before any work begins, along with safe testing procedures before touching conductors.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.