Solar PV Installation RAMS, Sorted Before the Scaffold Goes Up

Scaffold booked, panels on the way, and the client wants a RAMS. Add the site address, preview it free, and pay £15 when you're happy. No account needed, pay per document.

✓ Built around CDM 2015

What it covers on a PV install

  • Work at height: edge protection, roof anchors and fall arrest, and no working on wet or icy roofs.
  • Live DC: panels covered or worked in low light where possible, because they're live whenever light hits them, and the inverter isolated and locked off before you connect.
  • Getting panels up: a roof hoist or two-person lift, and no carrying panels up ladders in high wind.
  • Overhead lines: safe clearance kept from any overhead cables before ladders, scaffold or lifting kit go up.
  • Roof fixings: rafters found before drilling anchor points, and every penetration sealed so the roof stays watertight.

Who asks for it

Housebuilders, roofing contractors you're subbing to, commercial building owners and schools will often want a RAMS before you go up. Scaffold firms sometimes ask to see it too. It's the paperwork you need to get onto most UK sites.

MCS note: if the job is going through MCS certification, the RAMS sits alongside your MCS paperwork and commissioning records. It doesn't replace them.

Applicable Regulations

Work at Height Regulations 2005Electricity at Work Regulations 1989CDM Regulations 2015

Hazard & Risk Assessment

Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.

Sample hazard

Falls from Roof During Panel Fitting

Control: Use edge protection, roof anchor points and a fall arrest system in line with the Work at Height Regulations 2005. Never work on wet or icy roofs.

Initial Risk: HighResidual Risk: Low

Also covered in the full document:

  • DC Electrical Shock from Live Panels
  • Manual Handling of Panels & Mounting Rails
  • Working Near Overhead Power Lines
  • Fixing Roof Anchors & Penetrations

Frequently Asked Questions

Does it cover the risk of live DC from the panels?

Yes. Panels make live DC whenever they're in daylight, even with the system switched off downstream. The RAMS includes covering panels or working in low light where possible, and isolating the inverter before connecting.

Does it cover scaffold and roof work?

Yes. It includes edge protection, roof anchor points and fall arrest, built around the Work at Height Regulations 2005.

Fitting a battery at the same time?

Generate a second RAMS for the battery storage install. It covers DC battery terminals, fire risk and ventilation, which the PV document doesn't.

In the full document

  • The control measure for each of the 5 hazards
  • Required PPE list for this job
  • A step-by-step method statement
  • Emergency procedures & contacts
  • A sign-off section, as a clean PDF — emailed to you and ready to download

How it works

  1. Pick your job.
  2. Add the site address.
  3. Preview your RAMS free.
  4. Pay £15 and the PDF lands in your inbox.

No account needed, pay per document. Every RAMS includes a method statement, 5 rated hazards with controls, a PPE list and emergency procedures, built around CDM 2015 and HSE guidance. Spotted something to change? Free corrections within 14 days.