Battery Storage RAMS for UK Solar Installers
Battery retrofit or new PV-plus-storage job, the paperwork's the same faff every time. Generate a site-specific RAMS in minutes and get it to the client before you turn up. No account needed, pay per document.
✓ Built around CDM 2015What it covers on a battery install
- DC terminals: battery and connected inverter isolated and locked off before making or breaking connections, with insulated tools rated for the system voltage.
- Fire risk: installed to the manufacturer's clearance, ventilation and location guidance, and every unit checked for damage before it goes in.
- The lift: battery units are heavy and dense, so it's a trolley or two-person lift, mounted where it won't need lifting again for maintenance.
- Location: ventilation, temperature and clearances to the manufacturer's spec, keeping out of cupboards and spaces with poor airflow.
- Existing PV: compatibility with the existing inverter confirmed, and both systems isolated before any new connection.
Who asks for it
Housebuilders adding storage to new homes, commercial clients and the main contractor on a retrofit will usually want a RAMS. Some homeowners ask too, especially for batteries going in a garage or near the house. It's the paperwork you need to get onto most UK sites.
Applicable Regulations
Electricity at Work Regulations 1989BS 7671 (18th Edition Wiring Regulations)Manual Handling Operations 1992
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazardElectric Shock from DC Battery Terminals
Control: Isolate and lock off the battery system and any connected inverter before making or breaking connections. Use insulated tools rated for the system voltage.
Initial Risk: HighResidual Risk: Low
Also covered in the full document:
- 🔒Fire Risk from Incorrect Installation or Damaged Cells
- 🔒Manual Handling of Battery Units
- 🔒Ventilation & Location of the Battery Unit
- 🔒Interfacing with Existing Solar PV/Inverter Systems
Frequently Asked Questions
Does it cover fire risk from the battery?
Yes. It includes installing strictly to the manufacturer's clearance and ventilation guidance, plus a visual check for damaged cells before installation.
Can I use it for a retrofit onto an existing solar system?
Yes. It includes confirming compatibility with the existing inverter and isolating both systems before making new connections.
What PPE does it list?
1000V insulated gloves, safety glasses, safety boots, insulated hand tools and flame-resistant coveralls.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download
How it works
- Pick your job.
- Add the site address.
- Preview your RAMS free.
- Pay £15 and the PDF lands in your inbox.
No account needed, pay per document. Every RAMS includes a method statement, 5 rated hazards with controls, a PPE list and emergency procedures, built around CDM 2015 and HSE guidance. Spotted something to change? Free corrections within 14 days.