Underfloor Heating RAMS for UK Installers
Pipe down, pressure test, screed, commission. You know the job. Ramsforge writes it up as a site-specific RAMS so you can crack on. No account needed, pay per document.
✓ Built around CDM 2015What it covers on a UFH install
- Pressure testing: pipework tested to the manufacturer's spec before screed goes down, with the system clearly isolated while under test.
- Screed and boards: trolleys for bagged screed, mechanical mixing where possible, and team lifts for insulation boards.
- Dust: extraction on cutting tools and FFP2 masks when cutting insulation or chasing screed.
- Manifold: each zone balanced, commissioned and labelled before handover.
- Suspended timber floors: joist positions and floor loading checked before cutting, with no over-notching of load-bearing joists.
Who asks for it
Builders on extensions and kitchen-diner knock-throughs, new-build site managers and renovation main contractors usually want your RAMS before the UFH goes down. Get it done before the screeder turns up.
Applicable Regulations
Manual Handling Operations 1992PUWER 1998Water Supply (Water Fittings) Regulations 1999
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazardPressure Testing Pipework
Control: Pressure test all pipework to the manufacturer's specification before screeding, and isolate the system clearly while under test to prevent inadvertent use.
Initial Risk: HighResidual Risk: Low
Also covered in the full document:
- 🔒Manual Handling of Screed & Insulation Boards
- 🔒Cutting & Chasing Floor Insulation/Screed
- 🔒Manifold & Zone Valve Commissioning
- 🔒Working on Suspended Timber Floors
Frequently Asked Questions
Does it cover pressure testing the pipework?
Yes. It requires the pipework to be pressure tested to the manufacturer's spec, and isolated during the test, before screed is laid.
Can I use it for a retrofit over suspended timber floors?
Yes. It includes checking joist positions and floor loading before cutting, and avoiding excessive notching of load-bearing joists.
Is it for wet or electric underfloor heating?
It's written for wet, water-fed systems with a manifold. Electric mats are electrical work, so use an electrical RAMS for those.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download
How it works
- Pick your job.
- Add the site address.
- Preview your RAMS free.
- Pay £15 and the PDF lands in your inbox.
No account needed, pay per document. Every RAMS includes a method statement, 5 rated hazards with controls, a PPE list and emergency procedures, built around CDM 2015 and HSE guidance. Spotted something to change? Free corrections within 14 days.