Combi Boiler Replacement RAMS, Sorted in Minutes

Stop writing the same boiler swap paperwork for every job. Add the site address, preview your RAMS free, and pay £15 when you're happy. No account needed, pay per document.

✓ Built around CDM 2015

What it covers on a combi swap

  • Gas and flue: isolation, tightness testing before and after, and flue termination checks.
  • Draining down: draining into sealed containers before cutting pipes, and gloves for flushing chemicals.
  • The lift: two-person lift for the old unit and the new boiler (roughly 30 to 40kg).
  • Tight spots: task lighting and ventilation for airing cupboards and under-stairs boilers.
  • Condensate: routed and lagged to spec so it doesn't freeze and lock the boiler out.

Plus the PPE list and emergency procedures, all in one PDF.

Who asks for it

Housing associations, letting agents and main contractors often want a RAMS before you touch the boiler. Have it ready and skip the back-and-forth. It's the paperwork you need to get onto most UK sites.

Gas Safe note: gas work must be done by a Gas Safe registered engineer. The RAMS doesn't replace your registration, so add your number to the document.

Applicable Regulations

Gas Safety Regulations 1998COSHH Regulations 2002Manual Handling Operations 1992

Hazard & Risk Assessment

Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.

Sample hazard

Gas Leaks & Flue Gas Exposure

Control: Test gas tightness before and after install. Ensure the flue is terminated with clearances to the manufacturer's instructions.

Initial Risk: HighResidual Risk: Low

Also covered in the full document:

  • Hot System Water / Chemical Dosing
  • Manual Handling (Heavy Appliance)
  • Working in Confined Airing Cupboards/Under-Stairs Spaces
  • Condensate Pipe Freezing & Water Damage

Frequently Asked Questions

Do I need a RAMS for a domestic boiler swap?

Not every homeowner job asks for one. Housing associations, letting agents and main contractors often do, so having one ready saves you a wasted morning.

Does it cover gas tightness testing and flue checks?

Yes. The method statement includes gas isolation, tightness testing before and after the install, and flue termination checks, built around the Gas Safety (Installation and Use) Regulations 1998 and HSE guidance.

How quickly do I get it?

You see the preview on screen straight away. Pay £15 and the PDF is emailed to you. Need a change? Free corrections within 14 days.

In the full document

  • The control measure for each of the 5 hazards
  • Required PPE list for this job
  • A step-by-step method statement
  • Emergency procedures & contacts
  • A sign-off section, as a clean PDF — emailed to you and ready to download

How it works

  1. Pick your job.
  2. Add the site address.
  3. Preview your RAMS free.
  4. Pay £15 and the PDF lands in your inbox.

No account needed, pay per document. Every RAMS includes a method statement, 5 rated hazards with controls, a PPE list and emergency procedures, built around CDM 2015 and HSE guidance. Spotted something to change? Free corrections within 14 days.