Commercial EV Charging RAMS for Car Parks and Forecourts

Ducting, bases, feeder pillars, rapid chargers. More moving parts than a home install, and the principal contractor wants the RAMS before day one. Get it sorted in minutes. No account needed, pay per document.

✓ Built around CDM 2015

What it covers on a commercial install

  • High-power isolation: supply locked out at the distribution board and proved dead with a tester rated for the system voltage before connecting rapid or ultra-rapid units.
  • Excavation: CAT and Genny scan before trenching or digging charger bases, with hand-digging within 0.5m of known services.
  • Plant: pedestrian routes barriered off from excavators and dumpers, with a banksman for every reverse.
  • Live car parks: work area segregated from traffic with barriers and signage while chargers and cabling go in.
  • Supply capacity: site capacity confirmed with the DNO before high-power chargers go in, with load management where it's needed.

Who asks for it

Principal contractors, retail park and supermarket estates teams, local councils and fleet depots will usually want a RAMS before you break ground. On multi-site rollouts, the Multi-Site Pack (5 for £50) or Unlimited can save you money, and you can still pay per document whenever you like.

Applicable Regulations

Electricity at Work Regulations 1989CDM Regulations 2015BS 7671 (18th Edition Wiring Regulations)

Hazard & Risk Assessment

Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.

Sample hazard

High-Power Electrical Connection & Isolation

Control: Isolate and lock out the supply at the distribution board before connecting rapid or ultra-rapid charge points, testing dead using a proved voltage indicator rated for the system voltage.

Initial Risk: HighResidual Risk: Low

Also covered in the full document:

  • Excavation for Sub-Base & Cabling Runs
  • Manual Handling & Plant Interaction During Groundworks
  • Working Near Live Traffic in Car Parks
  • Load Assessment & DNO Coordination

Frequently Asked Questions

Does it cover the groundworks as well as the electrics?

Yes. It includes CAT and Genny scanning before excavation, plant segregation and a banksman, alongside the high-power isolation controls.

Does it mention DNO coordination?

Yes. It includes confirming supply capacity with the Distribution Network Operator before installing high-power charging, and applying load management where required.

I'm doing chargers across several sites. Do I need one per site?

Yes. Each RAMS is written for one site address, which is what principal contractors expect. That's what the Multi-Site Pack is for.

In the full document

  • The control measure for each of the 5 hazards
  • Required PPE list for this job
  • A step-by-step method statement
  • Emergency procedures & contacts
  • A sign-off section, as a clean PDF — emailed to you and ready to download

How it works

  1. Pick your job.
  2. Add the site address.
  3. Preview your RAMS free.
  4. Pay £15 and the PDF lands in your inbox.

No account needed, pay per document. Every RAMS includes a method statement, 5 rated hazards with controls, a PPE list and emergency procedures, built around CDM 2015 and HSE guidance. Spotted something to change? Free corrections within 14 days.

Related jobs

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00