Data Cabling RAMS, Sorted Before You Lift a Tile
Office fit-out, school network upgrade or a new comms room. The site manager wants your RAMS before you're through the door. Get it done in minutes. No account needed, pay per document.
✓ Built around CDM 2015What it covers on a cabling job
- Ceiling voids: a podium step or tower for pulling cable above the ceiling, never overreaching from a stepladder.
- Asbestos and confined spaces: task lighting, and a check for asbestos-containing materials before disturbing tiles in older ceilings.
- Reels and containment: a reel stand and trolley for heavy drums, and team lifts for tray and basket.
- Fire-stopping: every penetration through fire-rated walls and floors fire-stopped to spec, so compartments are restored when you finish.
- Risers: existing live electrical and data services identified first, with new cabling kept separate from them.
Who asks for it
Main contractors on office fit-outs, IT managed service providers you sub for, schools, universities and NHS estates teams usually want a RAMS on file before you start. Lots of sites a month? The Multi-Site Pack (5 for £50) or Unlimited can save you money. Pay per document is always there.
Applicable Regulations
Work at Height Regulations 2005Electricity at Work Regulations 1989Manual Handling Operations 1992
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazardFalls from Height Accessing Ceiling Voids
Control: Use a podium step or tower for above-ceiling cable pulling, never overreaching from a stepladder into a ceiling void.
Initial Risk: HighResidual Risk: Low
Also covered in the full document:
- 🔒Working in Confined Ceiling & Riser Spaces
- 🔒Manual Handling of Cable Reels & Containment
- 🔒Fire-Stopping of Cable Penetrations
- 🔒Working Near Existing Live Services in Risers
Frequently Asked Questions
Does it cover asbestos in older ceiling voids?
Yes. It includes checking for asbestos-containing materials before disturbing tiles or voids in older buildings, in line with the Control of Asbestos Regulations 2012.
Does it cover fire-stopping?
Yes. It includes fire-stopping every cable penetration through fire-rated walls and floors to the specification and restoring compartmentation when you finish.
Is this one for electricians too?
It's written for low-voltage data and network cabling. For mains circuits, use the rewire or EV charger RAMS instead.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download
How it works
- Pick your job.
- Add the site address.
- Preview your RAMS free.
- Pay £15 and the PDF lands in your inbox.
No account needed, pay per document. Every RAMS includes a method statement, 5 rated hazards with controls, a PPE list and emergency procedures, built around CDM 2015 and HSE guidance. Spotted something to change? Free corrections within 14 days.