Water Softener & Filtration System Installation RAMS Generator (UK)

Create a site-specific RAMS for water softener and filtration system installation, covering pipework and manual handling, in under 2 minutes.

✓ CDM 2015 Compliant

Applicable Regulations

Water Supply (Water Fittings) Regulations 1999Manual Handling Operations 1992PUWER 1998

Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Incorrect Plumbing-In Causing Backflow Contamination

Control: Install with an appropriate air gap or approved backflow prevention device in line with the Water Supply (Water Fittings) Regulations 1999.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling of Softener/Filtration Units & Salt Bags

Control: Use correct lifting technique for filtration units and bagged salt, and position the unit at a height that avoids repeated bending for future maintenance.

Initial Risk: HighResidual Risk: Low
Hazard

Water Leaks During Pipework Modification

Control: Isolate the water supply before cutting into pipework, and pressure test all new connections before restoring supply.

Initial Risk: HighResidual Risk: Low
Hazard

Working Near Electrical Consumer Units

Control: Maintain safe clearance from the electrical consumer unit when routing pipework, and isolate power if working in close proximity.

Initial Risk: HighResidual Risk: Low
Hazard

System Commissioning & Testing

Control: Commission and test the softener/filtration system for correct regeneration and flow before handover, checking for leaks at all new joints.

Initial Risk: HighResidual Risk: Low

Required PPE

Nitrile GlovesBS EN 166 Safety GlassesKnee PadsSafety BootsCut-Resistant Gloves

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover backflow contamination risks when plumbing in a filtration system?

Yes. It includes a control requiring an appropriate air gap or approved backflow prevention device, in line with the Water Supply (Water Fittings) Regulations 1999.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.