Applicable Regulations
Building Regulations Approved Document JHETAS Installation StandardsManual Handling Operations 1992
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazard
Fire Risk from Inadequate Hearth or Clearances
Control: Install to the manufacturer's minimum clearances to combustible materials, and confirm the hearth meets Building Regulations Approved Document J requirements before commissioning.
Also covered in the full document:
- Carbon Monoxide Exposure from Flue Faults
- Manual Handling of Stove Unit & Flue Liner
- Working at Height for Flue/Chimney Installation
- Building Regulations Notification
Frequently Asked Questions
Does this RAMS cover testing the flue for carbon monoxide safety?
Yes. It includes a control requiring a smoke or spillage test on the completed flue and a carbon monoxide alarm fitted before handover.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download