Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Falls During Steel Erection

Control: Use a fall arrest system with horizontal lifelines or a MEWP for connecting steelwork at height, with only trained steel erectors permitted to work aloft.

Initial Risk: HighResidual Risk: Low
Hazard

Crane Lifting Operations & Dropped Loads

Control: Plan every lift in line with a lifting plan supervised by an appointed person, using tested and certified lifting gear and a clear exclusion zone beneath the load.

Initial Risk: HighResidual Risk: Low
Hazard

Structural Instability of the Partially Erected Frame

Control: Temporarily brace and guy each erected section in line with the erection sequence drawing before the next lift proceeds.

Initial Risk: HighResidual Risk: Low
Hazard

Working Near Live Overhead Power Lines

Control: Identify and maintain safe clearance from overhead power lines before positioning cranes or lifting steel sections nearby.

Initial Risk: HighResidual Risk: Low
Hazard

Adverse Weather During Lifting Operations

Control: Suspend crane lifting operations in high winds exceeding the crane or component's rated limits.

Initial Risk: HighResidual Risk: Low

Required PPE

BS EN 397 Hard HatFall Arrest Harness (BS EN 361)BS EN ISO 20345 Safety BootsCut-Resistant GlovesHi-Vis Clothing

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover the crane lifting plan for steel erection?

Yes. It includes a control requiring every lift to be planned and supervised by an appointed person in line with a documented lifting plan, using tested and certified lifting gear.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00