Applicable Regulations
CDM Regulations 2015LOLER 1998Work at Height Regulations 2005
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazard
Falls During Steel Erection
Control: Use a fall arrest system with horizontal lifelines or a MEWP for connecting steelwork at height, with only trained steel erectors permitted to work aloft.
Also covered in the full document:
- Crane Lifting Operations & Dropped Loads
- Structural Instability of the Partially Erected Frame
- Working Near Live Overhead Power Lines
- Adverse Weather During Lifting Operations
Frequently Asked Questions
Does this RAMS cover the crane lifting plan for steel erection?
Yes. It includes a control requiring every lift to be planned and supervised by an appointed person in line with a documented lifting plan, using tested and certified lifting gear.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download