Applicable Regulations
Method Statement — Sequence of Work
- Review this RAMS and confirm site conditions match those described before work begins.
- Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
- Check and don all required PPE, and inspect tools and equipment before use.
- Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
- Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
- On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
- Complete the sign-off section at the end of this document before leaving site.
Hazard & Risk Assessment
Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.
Falls from MEWPs/Towers Above Public Footways
Control: Use a properly positioned MEWP or tower with the work area barriered off from pedestrians below, particularly on high street and public-facing installs.
Manual Handling of Sign Panels & Lettering
Control: Use mechanical lifting aids (glass/panel suckers, lifting frames) for large sign panels, and team-lift where mechanical aids aren't practical.
Electric Shock from Illuminated Sign Connections
Control: Isolate and lock off the relevant circuit before connecting illuminated signage, and use a proved voltage indicator to test dead before any electrical connection.
Working Above Public Pedestrians & Shoppers
Control: Barrier off and signpost the work area at ground level whenever working above an active public footway or shopping street.
Wind Loading on Large Sign Panels
Control: Check wind conditions before lifting or fitting large, low-density sign panels, as they act as sails and can be difficult to control in gusts.
Required PPE
Emergency Procedures
Fire
Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.
First Aid / Injury
Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.
Spillage / Environmental Incident
Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.
Frequently Asked Questions
Does this RAMS cover working above a public footway or high street?
Yes. It includes a control requiring the work area to be barriered off from pedestrians below when using a MEWP or tower above a public-facing footway.
Do I need to keep a copy of this RAMS on site?
Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.