Applicable Regulations
Work at Height Regulations 2005CDM Regulations 2015LOLER 1998
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazard
Falls During Erection/Dismantling
Control: Use an advance guardrail system (ADAS) so leading-edge protection is in place before operatives step onto each new lift. All scaffolders must hold a valid CISRS card.
Also covered in the full document:
- Overloading & Structural Collapse
- Falling Tools & Components
- Manual Handling of Scaffold Tubes & Boards
- Adverse Weather During Erection/Dismantling
Frequently Asked Questions
Does the RAMS cover TG20:21 compliance?
Yes. The generated method statement references TG20:21 compliant configurations and flags where a bespoke scaffold design is required instead.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download