✓ CDM 2015 Compliant

Applicable Regulations

Work at Height Regulations 2005COSHH Regulations 2002CDM Regulations 2015

Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Falls from Roof Edge

Control: Use edge protection or a harness with suitable anchor points in line with the Work at Height Regulations 2005. Never work on a flat roof in wet or icy conditions.

Initial Risk: HighResidual Risk: Low
Hazard

Exposure to GRP Resin & Catalyst Fumes

Control: Follow the COSHH data sheet for resin, catalyst and primer products. Ensure adequate ventilation and use appropriate RPE during application.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling of Roofing Membrane & Boards

Control: Use a roof hoist or two-person lift for insulation boards and membrane rolls. Avoid carrying large boards up ladders in high wind.

Initial Risk: HighResidual Risk: Low
Hazard

Hot Works & Torch-Applied Membrane Fire Risk

Control: Follow a hot work permit procedure when torch-applying membrane, keeping a fire extinguisher and fire watch in place during and after work, in line with FRA/RISCAuthority guidance.

Initial Risk: HighResidual Risk: Low
Hazard

Fragile Roof Areas & Roof Lights

Control: Identify and mark any fragile roof lights or areas before work begins, using crawl boards or staging to distribute weight safely.

Initial Risk: HighResidual Risk: Low

Required PPE

Fall Arrest Harness (BS EN 361)FFP3 Dust/Fume MaskChemical-Resistant GlovesNon-Slip Roofing BootsBS EN 166 Safety Glasses

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover the resin and catalyst fumes used in GRP roofing?

Yes. It includes COSHH-based controls for handling GRP resin, catalyst and primer products safely, including ventilation requirements.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.