Driveway & Patio Pressure Washing RAMS Generator (UK)

Create a site-specific RAMS for driveway and patio pressure washing work, covering high-pressure equipment and chemical treatment hazards, in under 2 minutes.

✓ CDM 2015 Compliant

Applicable Regulations

PUWER 1998COSHH Regulations 2002Manual Handling Operations 1992

Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

High-Pressure Water Jet Injury

Control: Never direct the jet at any person, and maintain a safe stand-off distance from the surface being cleaned in line with the equipment's rated pressure.

Initial Risk: HighResidual Risk: Low
Hazard

Exposure to Cleaning Chemicals & Biocides

Control: Follow the COSHH data sheet for all patio cleaners, algaecides and biocides used, and prevent run-off into drains or water courses.

Initial Risk: HighResidual Risk: Low
Hazard

Slips on Wet Surfaces During & After Cleaning

Control: Use warning signage around the work area and allow surfaces to dry before reopening to pedestrian traffic.

Initial Risk: HighResidual Risk: Low
Hazard

Damage to Vulnerable Surfaces & Pointing

Control: Adjust pressure and nozzle distance for the surface type, testing on an inconspicuous area first to avoid damaging soft pointing or block paving joints.

Initial Risk: HighResidual Risk: Low
Hazard

Working Near Electrical Fittings & Outdoor Sockets

Control: Identify and avoid directing the water jet at outdoor electrical fittings, sockets or lighting during cleaning.

Initial Risk: HighResidual Risk: Low

Required PPE

Waterproof CoverallsBS EN 166 Safety GlassesNon-Slip Waterproof FootwearChemical-Resistant GlovesHearing Protection

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover the risk of chemical run-off into drains?

Yes. It includes a control requiring run-off from patio cleaners, algaecides and biocides to be prevented from entering drains or water courses, in line with COSHH and environmental good practice.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.