Exterior Painting & Decorating RAMS Generator (UK)

Generate a site-specific RAMS for exterior painting and decorating work at height, covering ladder safety and paint COSHH controls, in 2 minutes.

✓ CDM 2015 Compliant

Applicable Regulations

Work at Height Regulations 2005COSHH Regulations 2002CDM Regulations 2015

Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Falls from Ladders/Towers

Control: Use a proper access tower or podium steps in preference to ladders where practical. Ladders restricted to short-duration, low-risk tasks and secured/footed at all times.

Initial Risk: HighResidual Risk: Low
Hazard

Exposure to Solvents & Paint Fumes

Control: Use low-VOC coatings where possible, ensure adequate ventilation, and follow the COSHH data sheet for each product used.

Initial Risk: HighResidual Risk: Low
Hazard

Slips on Wet or Painted Surfaces

Control: Cordon off wet paint areas, use non-slip matting on walkways, and allow adequate drying/cure time before reopening access routes.

Initial Risk: HighResidual Risk: Low
Hazard

Working Near Overhead Power Lines/Cables

Control: Identify and maintain safe clearance from any overhead electrical service cables before positioning ladders or towers near the property.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling of Access Equipment

Control: Use correct lifting technique and, where possible, a second person when carrying and erecting ladders or tower sections around the property.

Initial Risk: HighResidual Risk: Low

Required PPE

BS EN 166 Safety GlassesSolvent-Resistant GlovesFFP3 Dust/Fume MaskNon-Slip FootwearCoveralls

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Do I need a RAMS just for painting a house exterior?

Yes, if any part of the job involves ladders, towers or other access equipment. The Work at Height Regulations 2005 apply regardless of how brief the task is.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00