Applicable Regulations
CDM Regulations 2015Work at Height Regulations 2005Manual Handling Operations 1992
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazard
Structural Instability During Steel/Joist Installation
Control: Install temporary propping before removing or altering any load-bearing structure. Confirm structural calculations with a qualified engineer before work begins.
Also covered in the full document:
- Falls Through Ceiling Joists or Open Floor Areas
- Manual Handling of Steel Beams & Timber
- Working at Height on the External Scaffold/Roof
- Dust & Debris from Structural Alteration Work
Frequently Asked Questions
Does this RAMS cover the structural risks of removing load-bearing elements?
Yes. It includes a control requiring temporary propping and engineer-confirmed structural calculations before any load-bearing element is altered.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download