Loft Boarding for Storage RAMS Generator (UK)

Create a site-specific RAMS for loft boarding and storage solution installation, covering joist safety and confined space access, in under 2 minutes.

✓ CDM 2015 Compliant

Applicable Regulations

Work at Height Regulations 2005Manual Handling Operations 1992COSHH Regulations 2002

Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Falls Through Ceilings Between Joists

Control: Never step off joists or crawl boards directly onto ceiling material, identifying joist positions and existing insulation depth before laying boards.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling of Loft Boards & Raised Leg Battens

Control: Use a loft board conveyor or pass boards hand-to-hand up a properly footed ladder rather than carrying stacks singlehanded.

Initial Risk: HighResidual Risk: Low
Hazard

Exposure to Existing Insulation Fibres

Control: Wear an FFP3 mask and gloves when moving or working around existing mineral wool insulation to lay raised-leg battens.

Initial Risk: HighResidual Risk: Low
Hazard

Overloading Ceiling Joists with Storage Weight

Control: Confirm joist size and spacing before recommending raised-leg boarding, avoiding overloading ceiling joists not designed for storage loads.

Initial Risk: HighResidual Risk: Low
Hazard

Existing Electrical Cabling in the Loft

Control: Identify and avoid existing electrical cabling when fitting battens and boards, reporting any damaged or exposed wiring found.

Initial Risk: HighResidual Risk: Low

Required PPE

FFP3 Dust MaskKnee PadsCut-Resistant GlovesBS EN 166 Safety GlassesSafety Boots

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover the risk of falling through the ceiling while boarding a loft?

Yes. It includes a control requiring joist positions to be identified and crawl boards used before any boarding begins, preventing steps directly onto ceiling material.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.