Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Burns from Hot Tarmac/Asphalt

Control: Wear heat-resistant gloves and boots when handling and raking hot material, and keep bystanders clear of the tipping and laying area.

Initial Risk: HighResidual Risk: Low
Hazard

Plant & Roller Movement on Site

Control: Use a banksman when reversing dumpers or rollers, and keep pedestrians segregated from the compaction area while rolling is underway.

Initial Risk: HighResidual Risk: Low
Hazard

Exposure to Bitumen Fumes

Control: Work in well-ventilated conditions where possible, and follow the COSHH data sheet for the specific asphalt/bitumen product being laid.

Initial Risk: HighResidual Risk: Low
Hazard

Edge Restraint & Kerb Installation

Control: Install edge restraints and kerbs before laying tarmac to contain the material and prevent edge slumping.

Initial Risk: HighResidual Risk: Low
Hazard

Working Near Existing Driveways/Access Routes

Control: Maintain a safe alternative access route for residents and vehicles while the driveway surface cures.

Initial Risk: HighResidual Risk: Low

Required PPE

Heat-Resistant GlovesBS EN ISO 20345 Safety Boots (Heat Resistant Sole)Hi-Vis ClothingBS EN 166 Safety GlassesFFP2 Dust Mask

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover the risk of burns from hot tarmac?

Yes. It includes a control requiring heat-resistant gloves and boots for anyone handling or raking hot material, alongside a clear working area for the tipping and laying process.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00