Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Excavation Collapse Around the Tank Chamber

Control: Batter, shore or box excavations over 1.2m deep in line with a competent person's assessment, particularly around the larger open excavation required for a tank chamber.

Initial Risk: HighResidual Risk: Low
Hazard

Confined Space Entry for Connections & Inspection

Control: Never enter the tank chamber without a permit-to-work, atmosphere testing and a trained top-man in constant communication.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling & Plant Interaction

Control: Use mechanical lifting for the tank itself, and keep operatives clear of the excavator's swing radius during placement.

Initial Risk: HighResidual Risk: Low
Hazard

Groundwater & Buoyancy Risk to the Tank

Control: Assess groundwater levels before installation and anchor or ballast the tank as specified by the manufacturer to prevent flotation.

Initial Risk: HighResidual Risk: Low
Hazard

Percolation Testing & Soakaway Siting

Control: Confirm percolation test results and soakaway siting distances from buildings, boundaries and watercourses in line with Building Regulations Part H before installation.

Initial Risk: HighResidual Risk: Low

Required PPE

BS EN 397 Hard HatGas DetectorHi-Vis ClothingBS EN ISO 20345 Safety BootsWaterproof Gloves

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover confined space entry into the tank chamber?

Yes. It includes a control prohibiting entry without a permit-to-work, atmosphere testing and a trained top-man, in line with the Confined Spaces Regulations 1997.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00