Ramsforge

Drainage Installation & Excavation RAMS Generator (UK)

Create a RAMS built around CDM 2015 for drainage installation and excavation work, covering trench collapse and buried services, in under 2 minutes.

✓ Built around CDM 2015

Applicable Regulations

CDM Regulations 2015Manual Handling Operations 1992Confined Spaces Regulations 1997

Hazard & Risk Assessment

Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.

Sample hazard

Trench Collapse

Control: Batter, shore or box excavations over 1.2m deep in line with a competent person's assessment. No one enters an unsupported trench.

Initial Risk: HighResidual Risk: Low

Also covered in the full document:

  • Striking Buried Services
  • Manual Handling of Pipes & Materials
  • Plant & Excavator Movement Near the Trench
  • Ingress of Water into the Excavation

Frequently Asked Questions

Does this RAMS cover excavations near existing services?

Yes. It includes a CAT & Genny scanning step and safe digging practice around buried services, in line with HSE guidance HSG47.

In the full document

  • The control measure for each of the 5 hazards
  • Required PPE list for this job
  • A step-by-step method statement
  • Emergency procedures & contacts
  • A sign-off section, as a clean PDF — emailed to you and ready to download

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00