Applicable Regulations
Manual Handling Operations 1992PUWER 1998CDM Regulations 2015
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazard
Striking Buried Services When Digging Post Holes
Control: Conduct a CAT & Genny scan before digging. Hand-dig the first 0.5m of each post hole near suspected service routes.
Also covered in the full document:
- Manual Handling of Posts, Panels & Concrete
- Power Tool Use (Post Drivers, Augers)
- Working Near Boundaries & Neighbouring Property
- Concrete Mixing & Handling
Frequently Asked Questions
Does this RAMS cover fencing near underground services?
Yes. It includes a CAT & Genny scanning step and safe digging practice before any post holes are dug, in line with HSE guidance HSG47.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download