Applicable Regulations
Method Statement — Sequence of Work
- Review this RAMS and confirm site conditions match those described before work begins.
- Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
- Check and don all required PPE, and inspect tools and equipment before use.
- Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
- Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
- On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
- Complete the sign-off section at the end of this document before leaving site.
Hazard & Risk Assessment
Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.
Manual Handling of Heavy Stone
Control: Assess each stone individually before lifting, using mechanical aids (stone grabs, mini-diggers) for larger pieces and team-lifting where mechanical aids aren't practical.
Wall Collapse During Dismantling or Rebuilding
Control: Dismantle and rebuild in short, stable sections, never leaving a partially built or destabilised section unsupported overnight.
Crush & Trapped Finger Injuries When Placing Stone
Control: Use appropriate hand positioning and tools (not fingers) to guide heavy stones into final position.
Working on Sloped or Uneven Ground
Control: Assess ground stability and footing before working on sloped sites, using appropriate footwear and taking care when moving stone on uneven terrain.
Weather Exposure During Prolonged Outdoor Work
Control: Wear appropriate weatherproof clothing and take regular breaks during prolonged exposure to wind, rain or sun on exposed sites.
Required PPE
Emergency Procedures
Fire
Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.
First Aid / Injury
Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.
Spillage / Environmental Incident
Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.
Frequently Asked Questions
Does this RAMS cover the risk of wall collapse during rebuilding?
Yes. It includes a control requiring dismantling and rebuilding in short, stable sections, with no partially built section left unsupported overnight.
Do I need to keep a copy of this RAMS on site?
Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.