New Build Wall Construction & Blockwork RAMS Generator (UK)

Generate a site-specific RAMS built around CDM 2015 for bricklaying and blockwork on new build walls, covering manual handling and scaffold access, in 2 minutes.

✓ Built around CDM 2015

Applicable Regulations

CDM Regulations 2015Manual Handling Operations 1992Work at Height Regulations 2005

Hazard & Risk Assessment

Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.

Sample hazard

Manual Handling of Bricks, Blocks & Mortar

Control: Use a mechanical hoist or brick/block dispenser to reduce repetitive lifting. Team-lift heavy lintels and mix mortar in small batches to limit bag handling.

Initial Risk: HighResidual Risk: Low

Also covered in the full document:

  • Working from Scaffold/Bricklayer's Platform
  • Cement & Mortar Skin/Dust Contact
  • Wet Weather & Ground Conditions on New Build Sites
  • Manual Handling of Lintels & Padstones

Frequently Asked Questions

Does this RAMS cover working from a bricklayer's scaffold platform?

Yes. It includes controls for safe access, guardrails and platform boarding standards required before laying block or brickwork above 2m.

In the full document

  • The control measure for each of the 5 hazards
  • Required PPE list for this job
  • A step-by-step method statement
  • Emergency procedures & contacts
  • A sign-off section, as a clean PDF — emailed to you and ready to download

Get this as a personalised, watermark-free PDF for your job.