Applicable Regulations
Method Statement — Sequence of Work
- Review this RAMS and confirm site conditions match those described before work begins.
- Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
- Check and don all required PPE, and inspect tools and equipment before use.
- Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
- Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
- On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
- Complete the sign-off section at the end of this document before leaving site.
Hazard & Risk Assessment
Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.
Burns from Forge Work & Hot Metal
Control: Wear heat-resistant gauntlets and use tongs appropriate to the workpiece, keeping a clear, uncluttered area around the forge or hearth.
Fire Risk from Hot Work & Sparks
Control: Clear the area of combustible materials within a 10m radius before forging or grinding, keeping a fire extinguisher on hand.
Manual Handling & Installation of Heavy Gates/Railings
Control: Use mechanical lifting aids or a minimum two-person team to position and hang heavy gates, supporting the structure fully before removing lifting equipment.
Noise Exposure from Hammering & Grinding
Control: Wear hearing protection during hammering, grinding and power tool use, and limit continuous exposure where practical.
Compressed Gas & Fuel Handling (Forge)
Control: Store and handle forge fuel (gas or solid fuel) safely, checking hoses and connections for gas forges before lighting.
Required PPE
Emergency Procedures
Fire
Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.
First Aid / Injury
Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.
Spillage / Environmental Incident
Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.
Frequently Asked Questions
Does this RAMS cover the fire risk from forge work and grinding?
Yes. It includes a control requiring a 10m radius clearance of combustible materials before hot work begins, with a fire extinguisher kept on hand throughout.
Do I need to keep a copy of this RAMS on site?
Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.