Scaffold Erection & Dismantling RAMS Generator (UK)
✓ CDM 2015 CompliantApplicable Regulations
Work at Height Regulations 2005CDM Regulations 2015LOLER 1998
Hazards Covered
This document identifies and provides a control measure for each hazard below, with a risk rating before and after controls.
- Falls During Erection/Dismantling
- Overloading & Structural Collapse
- Falling Tools & Components
- Manual Handling of Scaffold Tubes & Boards
- Adverse Weather During Erection/Dismantling
Unlocked after payment
- The full control measure for each of the 5 hazards above
- Required PPE list
- A step-by-step method statement
- Emergency procedures & contacts
- FAQs and the sign-off section
- A clean, watermark-free PDF — emailed to you and ready to download