Rail Signalling & OLE Work RAMS Generator (UK)
✓ Site-Specific RAMSApplicable Regulations
Electricity at Work Regulations 1989Railways and Other Guided Transport Systems (Safety) Regulations 2006 (ROGS)Work at Height Regulations 2005
Hazards Covered
This document identifies and provides a control measure for each hazard below, with a risk rating before and after controls.
- Electric Shock from Overhead Line Equipment
- Falls During Signal Gantry or OLE Structure Access
- Being Struck by Rail Traffic
- Manual Handling of Signalling & OLE Equipment
- Testing & Commissioning of Signalling Systems
Unlocked after payment
- The full control measure for each of the 5 hazards above
- Required PPE list
- A step-by-step method statement
- Emergency procedures & contacts
- FAQs and the sign-off section
- A clean, watermark-free PDF — emailed to you and ready to download