Underfloor Heating Installation RAMS Generator (UK)
✓ CDM 2015 CompliantApplicable Regulations
Manual Handling Operations 1992PUWER 1998Water Supply (Water Fittings) Regulations 1999
Hazards Covered
This document identifies and provides a control measure for each hazard below, with a risk rating before and after controls.
- Pressure Testing Pipework
- Manual Handling of Screed & Insulation Boards
- Cutting & Chasing Floor Insulation/Screed
- Manifold & Zone Valve Commissioning
- Working on Suspended Timber Floors
Unlocked after payment
- The full control measure for each of the 5 hazards above
- Required PPE list
- A step-by-step method statement
- Emergency procedures & contacts
- FAQs and the sign-off section
- A clean, watermark-free PDF — emailed to you and ready to download