Timber & Composite Decking Installation RAMS Generator (UK)
✓ CDM 2015 CompliantApplicable Regulations
Work at Height Regulations 2005Manual Handling Operations 1992PUWER 1998
Hazards Covered
This document identifies and provides a control measure for each hazard below, with a risk rating before and after controls.
- Falls from Raised Decking During Construction
- Power Tool Use (Saws, Drills)
- Manual Handling of Deck Boards & Joists
- Ground Preparation & Sub-Base Stability
- Weather-Related Slip Risk on Composite Decking
Unlocked after payment
- The full control measure for each of the 5 hazards above
- Required PPE list
- A step-by-step method statement
- Emergency procedures & contacts
- FAQs and the sign-off section
- A clean, watermark-free PDF — emailed to you and ready to download