Curtain Pole & Blind Installation RAMS Generator (UK)
✓ CDM 2015 CompliantApplicable Regulations
Work at Height Regulations 2005PUWER 1998Manual Handling Operations 1992
Hazards Covered
This document identifies and provides a control measure for each hazard below, with a risk rating before and after controls.
- Falls from Steps or Ladders When Fitting Poles/Tracks
- Drilling into Walls & Ceilings (Hidden Services)
- Manual Handling of Heavy Curtains, Poles & Motorised Blinds
- Motorised Blind Electrical Connection
- Child Safety Cord & Chain Compliance
Unlocked after payment
- The full control measure for each of the 5 hazards above
- Required PPE list
- A step-by-step method statement
- Emergency procedures & contacts
- FAQs and the sign-off section
- A clean, watermark-free PDF — emailed to you and ready to download