New Build Wall Construction & Blockwork RAMS Generator (UK)
✓ CDM 2015 CompliantApplicable Regulations
CDM Regulations 2015Manual Handling Operations 1992Work at Height Regulations 2005
Hazards Covered
This document identifies and provides a control measure for each hazard below, with a risk rating before and after controls.
- Manual Handling of Bricks, Blocks & Mortar
- Working from Scaffold/Bricklayer's Platform
- Cement & Mortar Skin/Dust Contact
- Wet Weather & Ground Conditions on New Build Sites
- Manual Handling of Lintels & Padstones
Unlocked after payment
- The full control measure for each of the 5 hazards above
- Required PPE list
- A step-by-step method statement
- Emergency procedures & contacts
- FAQs and the sign-off section
- A clean, watermark-free PDF — emailed to you and ready to download