Racking Installation & Warehouse Fit-Out RAMS Generator (UK)

Generate a site-specific RAMS for warehouse racking installation and fit-out work, covering structural safety and MEWP operation, in 2 minutes.

✓ CDM 2015 Compliant

Applicable Regulations

Work at Height Regulations 2005PUWER 1998Manual Handling Operations 1992

Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Racking Collapse During Installation

Control: Install racking strictly to the manufacturer's design and loading specification, with base plates fixed and frames braced before any loading. Have the installation checked by a SEMA-qualified inspector before handover.

Initial Risk: HighResidual Risk: Low
Hazard

Falls from MEWPs & Access Platforms

Control: Only trained and certified operatives (IPAF) to use MEWPs or scissor lifts, with harnesses worn in boom-type platforms in line with the manufacturer's guidance.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling of Racking Components

Control: Use mechanical lifting aids for heavy upright frames and beams. Team-lift where mechanical aids aren't practical, keeping loads close to the body.

Initial Risk: HighResidual Risk: Low
Hazard

Working Around Live Warehouse Operations

Control: Segregate the installation area from live picking and MHE traffic routes using barriers, coordinating with warehouse management.

Initial Risk: HighResidual Risk: Low
Hazard

Floor Loading & Anchor Fixing

Control: Confirm floor loading capacity and use anchors rated for the racking design before fixing base plates.

Initial Risk: HighResidual Risk: Low

Required PPE

BS EN 397 Hard HatFall Arrest Harness (BS EN 361)BS EN ISO 20345 Safety BootsWork GlovesHi-Vis Clothing

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover SEMA inspection requirements for racking installation?

Yes. It includes a control requiring installation to be checked by a SEMA-qualified inspector before handover, in line with industry good practice for racking safety.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.