Applicable Regulations
CDM Regulations 2015Control of Asbestos Regulations 2012Manual Handling Operations 1992
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazard
Undisclosed Hazardous Materials in Older Housing Stock
Control: Check the property's asbestos register before starting, and stop work immediately if suspect materials are disturbed during strip-out or repair.
Also covered in the full document:
- Access to Properties with Unknown Occupancy History
- Manual Handling of Fixtures & Waste During Clearance
- Security & Lone Working in Empty Properties
- Utility Isolation Before Works Begin
Frequently Asked Questions
Does this RAMS cover the risk of asbestos in older housing stock?
Yes. It includes a control requiring the property's asbestos register to be checked before work starts, with a stop-work procedure if suspect materials are disturbed.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download