Applicable Regulations
Electricity at Work Regulations 1989Manual Handling Operations 1992Health and Safety at Work etc. Act 1974
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazard
Electric Shock from Pitch Hook-Up Points
Control: Isolate and lock off the relevant supply before working on pitch electrical hook-up bollards or distribution, testing dead before any connection work.
Also covered in the full document:
- Vehicle Movement Around Pitches & Pedestrians
- Manual Handling During Pitch & Facility Upkeep
- Fire Safety Across the Site
- Working Near Water & Drainage Infrastructure
Frequently Asked Questions
Does this RAMS cover the electrical safety of pitch hook-up points?
Yes. It includes a control requiring isolation and lock-off of the relevant supply before any work on pitch hook-up bollards or distribution, with dead testing before connection.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download