Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Electric Shock from Pitch Hook-Up Points

Control: Isolate and lock off the relevant supply before working on pitch electrical hook-up bollards or distribution, testing dead before any connection work.

Initial Risk: HighResidual Risk: Low
Hazard

Vehicle Movement Around Pitches & Pedestrians

Control: Enforce a site speed limit for maintenance vehicles and plant, with clear segregation from pedestrian routes and children's play areas.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling During Pitch & Facility Upkeep

Control: Use trolleys and mechanical aids for heavy items such as gas bottles and waste bins, using correct lifting technique throughout.

Initial Risk: HighResidual Risk: Low
Hazard

Fire Safety Across the Site

Control: Maintain clear access for fire appliances between pitches, and check fire points and extinguishers are accessible and in date.

Initial Risk: HighResidual Risk: Low
Hazard

Working Near Water & Drainage Infrastructure

Control: Identify and isolate water and drainage connections before maintenance work, particularly on shared amenity blocks and standpipes.

Initial Risk: HighResidual Risk: Low

Required PPE

1000V Insulated GlovesHi-Vis ClothingBS EN ISO 20345 Safety BootsBS EN 166 Safety GlassesCut-Resistant Gloves

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover the electrical safety of pitch hook-up points?

Yes. It includes a control requiring isolation and lock-off of the relevant supply before any work on pitch hook-up bollards or distribution, with dead testing before connection.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00