Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Vehicle & Plant Movement During Build

Control: Segregate pedestrian routes from vehicle and plant movement with clear signage, and use a banksman for reversing plant on the build site.

Initial Risk: HighResidual Risk: Low
Hazard

Ground Condition Hazards (Uneven Terrain, Mud)

Control: Assess and, where needed, trackway or matting over soft ground before heavy loads or frequent vehicle movement, particularly after wet weather.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling of Fencing, Trackway & Structure Components

Control: Team-lift heavy fencing panels and trackway sections, and use mechanical handling for palletised materials wherever possible.

Initial Risk: HighResidual Risk: Low
Hazard

Working Near Underground Services on Festival Sites

Control: Conduct a CAT & Genny scan and consult utility drawings before excavating for ground anchors, cabling trenches or structure foundations.

Initial Risk: HighResidual Risk: Low
Hazard

Weather Conditions During Site Build

Control: Monitor weather forecasts throughout the build, adjusting the work programme for high winds, heavy rain or lightning risk.

Initial Risk: HighResidual Risk: Low

Required PPE

BS EN 397 Hard HatHi-Vis ClothingBS EN ISO 20345 Safety BootsWork GlovesBS EN 166 Safety Glasses

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover vehicle and plant movement during the site build phase?

Yes. It includes a control requiring segregated pedestrian and vehicle routes with clear signage, and a banksman for all reversing plant movements.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00