Ramsforge

Ride Maintenance & Inspection RAMS Generator (UK)

Create a site-specific RAMS for theme park ride maintenance and inspection, covering mechanical isolation and working at height, in under 2 minutes.

✓ Site-Specific RAMS

Applicable Regulations

PUWER 1998LOLER 1998Work at Height Regulations 2005

Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Unexpected Ride Movement During Maintenance

Control: Follow the ride's lock-out/tag-out procedure to fully isolate power before any mechanical or electrical intervention, confirming zero energy state before work begins.

Initial Risk: HighResidual Risk: Low
Hazard

Falls During Elevated Ride Structure Inspection

Control: Use a fall arrest system with suitable anchor points when inspecting elevated track, structure or plant, with only trained and competent technicians working aloft.

Initial Risk: HighResidual Risk: Low
Hazard

Structural & Component Fatigue Going Undetected

Control: Carry out inspection strictly to the manufacturer's schedule and NDT (non-destructive testing) requirements, recording findings in the ride's engineering log before it is reopened to the public.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling of Ride Components

Control: Use mechanical lifting aids for heavy ride components and panels, team-lifting where mechanical aids aren't practical.

Initial Risk: HighResidual Risk: Low
Hazard

Public Exclusion During Testing & Commissioning

Control: Maintain a public exclusion zone around the ride during test cycles and commissioning, only reopening once testing is fully signed off.

Initial Risk: HighResidual Risk: Low

Required PPE

Fall Arrest Harness (BS EN 361)BS EN 397 Hard HatBS EN ISO 20345 Safety BootsCut-Resistant GlovesBS EN 166 Safety Glasses

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover the lock-out/tag-out procedure before working on a ride?

Yes. It includes a control requiring the ride's lock-out/tag-out procedure to fully isolate power and confirm zero energy state before any mechanical or electrical intervention.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00