Ramsforge

Ride Maintenance & Inspection RAMS Generator (UK)

Create a site-specific RAMS for theme park ride maintenance and inspection, covering mechanical isolation and working at height, in under 2 minutes.

✓ Site-Specific RAMS

Applicable Regulations

PUWER 1998LOLER 1998Work at Height Regulations 2005

Hazard & Risk Assessment

Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.

Sample hazard

Unexpected Ride Movement During Maintenance

Control: Follow the ride's lock-out/tag-out procedure to fully isolate power before any mechanical or electrical intervention, confirming zero energy state before work begins.

Initial Risk: HighResidual Risk: Low

Also covered in the full document:

  • Falls During Elevated Ride Structure Inspection
  • Structural & Component Fatigue Going Undetected
  • Manual Handling of Ride Components
  • Public Exclusion During Testing & Commissioning

Frequently Asked Questions

Does this RAMS cover the lock-out/tag-out procedure before working on a ride?

Yes. It includes a control requiring the ride's lock-out/tag-out procedure to fully isolate power and confirm zero energy state before any mechanical or electrical intervention.

In the full document

  • The control measure for each of the 5 hazards
  • Required PPE list for this job
  • A step-by-step method statement
  • Emergency procedures & contacts
  • A sign-off section, as a clean PDF — emailed to you and ready to download

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00