Applicable Regulations
Method Statement — Sequence of Work
- Review this RAMS and confirm site conditions match those described before work begins.
- Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
- Check and don all required PPE, and inspect tools and equipment before use.
- Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
- Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
- On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
- Complete the sign-off section at the end of this document before leaving site.
Hazard & Risk Assessment
Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.
Vehicle & Aircraft Movement on the Ramp
Control: Follow the airport's airside driving permit rules at all times, maintaining safe separation from moving aircraft and using a marshaller where required.
Jet Blast & Engine Intake Hazards
Control: Maintain the minimum safe clearance distance from running engines specified by the aircraft type, and never approach an aircraft with engines running without authorisation.
Manual Handling of Baggage & Cargo
Control: Use mechanical belt loaders and conveyors wherever possible, and follow correct lifting technique for baggage handled manually into the hold.
Noise Exposure on the Ramp
Control: Wear hearing protection at all times on the ramp in line with the airport's noise zoning requirements.
Weather Conditions Affecting Ramp Operations
Control: Follow the airport's adverse weather procedures, suspending operations in lightning risk or severe wind conditions.
Required PPE
Emergency Procedures
Fire
Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.
First Aid / Injury
Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.
Spillage / Environmental Incident
Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.
Frequently Asked Questions
Does this RAMS cover jet blast and engine intake hazards on the ramp?
Yes. It includes a control requiring minimum safe clearance distances from running aircraft engines, reflecting one of the most serious hazards specific to airside ramp work.
Do I need to keep a copy of this RAMS on site?
Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.