Ramsforge

Trackside Maintenance & Possession Work RAMS Generator (UK)

Generate a site-specific RAMS for trackside maintenance and possession work, covering line safety and access control, in 2 minutes.

✓ Site-Specific RAMS

Applicable Regulations

Railways and Other Guided Transport Systems (Safety) Regulations 2006 (ROGS)Network Rail Standards (Rule Book)Manual Handling Operations 1992

Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Being Struck by Rail Traffic

Control: Work only within a properly authorised possession or under a valid Safe System of Work, with a competent Controller of Site Safety (COSS) in place before any trackside access.

Initial Risk: HighResidual Risk: Low
Hazard

Trips & Falls on Ballast & Trackside Terrain

Control: Use appropriate footwear for uneven ballast, maintain awareness of the walking route, and use lookouts/warning systems as specified in the Safe System of Work.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling of Track Components & Equipment

Control: Use mechanical lifting aids for rail sections and sleepers wherever possible, and team-lift smaller components in line with site manual handling assessments.

Initial Risk: HighResidual Risk: Low
Hazard

Adverse Weather on the Trackside

Control: Monitor weather conditions throughout the possession, adjusting the safe system of work for ice, heavy rain or high winds affecting the trackside.

Initial Risk: HighResidual Risk: Low
Hazard

Noise Exposure from Passing Trains & Machinery

Control: Wear hearing protection during possession work near operational lines and when using track machinery.

Initial Risk: HighResidual Risk: Low

Required PPE

Hi-Vis Clothing (Orange, Network Rail Spec)BS EN 397 Hard HatBS EN ISO 20345 Safety BootsHearing ProtectionBS EN 166 Safety Glasses

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover the requirement for a Safe System of Work and COSS?

Yes. It includes a control requiring all trackside access to take place only within a properly authorised possession or under a valid Safe System of Work with a competent COSS in place.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00