Ramsforge

Rail Signalling & OLE Work RAMS Generator (UK)

Create a site-specific RAMS for rail signalling and overhead line equipment work, covering electrical isolation and height access, in under 2 minutes.

✓ Site-Specific RAMS

Applicable Regulations

Electricity at Work Regulations 1989Railways and Other Guided Transport Systems (Safety) Regulations 2006 (ROGS)Work at Height Regulations 2005

Hazard & Risk Assessment

Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.

Sample hazard

Electric Shock from Overhead Line Equipment

Control: Never approach OLE within the specified safe clearance distance unless it has been formally isolated and earthed by an authorised person, confirmed in writing before work begins.

Initial Risk: HighResidual Risk: Low

Also covered in the full document:

  • Falls During Signal Gantry or OLE Structure Access
  • Being Struck by Rail Traffic
  • Manual Handling of Signalling & OLE Equipment
  • Testing & Commissioning of Signalling Systems

Frequently Asked Questions

Does this RAMS cover the isolation requirements for working near overhead line equipment?

Yes. It includes a control prohibiting approach within the safe clearance distance unless OLE has been formally isolated and earthed by an authorised person, confirmed in writing.

In the full document

  • The control measure for each of the 5 hazards
  • Required PPE list for this job
  • A step-by-step method statement
  • Emergency procedures & contacts
  • A sign-off section, as a clean PDF — emailed to you and ready to download

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00