Applicable Regulations
Electricity at Work Regulations 1989Railways and Other Guided Transport Systems (Safety) Regulations 2006 (ROGS)Work at Height Regulations 2005
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazard
Electric Shock from Overhead Line Equipment
Control: Never approach OLE within the specified safe clearance distance unless it has been formally isolated and earthed by an authorised person, confirmed in writing before work begins.
Also covered in the full document:
- Falls During Signal Gantry or OLE Structure Access
- Being Struck by Rail Traffic
- Manual Handling of Signalling & OLE Equipment
- Testing & Commissioning of Signalling Systems
Frequently Asked Questions
Does this RAMS cover the isolation requirements for working near overhead line equipment?
Yes. It includes a control prohibiting approach within the safe clearance distance unless OLE has been formally isolated and earthed by an authorised person, confirmed in writing.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download