Ramsforge

Brewery & Distillery Plant Maintenance RAMS Generator (UK)

Create a site-specific RAMS for brewery and distillery plant maintenance, covering confined space and flammable atmosphere hazards, in under 2 minutes.

✓ Site-Specific RAMS

Applicable Regulations

Confined Spaces Regulations 1997DSEAR 2002PUWER 1998

Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Confined Space Entry into Vessels & Tanks

Control: Test the atmosphere before entry into any fermentation vessel, tank or cellar, using a permit-to-work system with a trained top-man in constant communication.

Initial Risk: HighResidual Risk: Low
Hazard

CO2 Build-Up & Oxygen Displacement During Fermentation

Control: Use a calibrated gas monitor in cellars and fermentation areas, evacuating immediately if CO2 levels exceed the site's safe threshold.

Initial Risk: HighResidual Risk: Low
Hazard

Flammable Atmosphere Risk During Spirit Distillation

Control: Follow the site's DSEAR zoning and hot work permit procedure, eliminating ignition sources in classified areas around stills and spirit storage.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling of Casks, Kegs & Raw Materials

Control: Use mechanical lifting aids for heavy casks, kegs and sacks of raw materials, team-lifting where mechanical aids aren't practical.

Initial Risk: HighResidual Risk: Low
Hazard

Hot Surfaces & Steam During Brewing/Distilling

Control: Wear heat-resistant gloves and maintain awareness of hot surfaces, steam lines and pressurised vessels during brewing and distilling processes.

Initial Risk: HighResidual Risk: Low

Required PPE

Gas DetectorChemical-Resistant GlovesBS EN ISO 20345 Safety BootsBS EN 166 Safety GlassesHearing Protection

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover the risk of CO2 build-up in fermentation cellars?

Yes. It includes a control requiring a calibrated gas monitor in cellars and fermentation areas, with immediate evacuation if CO2 levels exceed the site's safe threshold — a well-known risk in brewing and distilling.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.