Ramsforge

Marina & Pontoon Maintenance RAMS Generator (UK)

Create a site-specific RAMS for marina and pontoon maintenance work, covering water safety and slip hazards, in under 2 minutes.

✓ Site-Specific RAMS

Applicable Regulations

Management of Health and Safety at Work Regulations 1999Manual Handling Operations 1992PUWER 1998

Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Falling Into Water from Pontoons or Jetties

Control: Wear a buoyancy aid when working near the water's edge, and ensure life rings and rescue equipment are accessible at the work location throughout.

Initial Risk: HighResidual Risk: Low
Hazard

Slips on Wet & Algae-Covered Surfaces

Control: Use non-slip footwear appropriate for wet decking, and clean or treat algae build-up on walkways regularly to reduce slip risk.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling of Pontoon Sections & Fixings

Control: Team-lift pontoon sections and heavy fixings, and use a small crane or hoist for larger structural components where available.

Initial Risk: HighResidual Risk: Low
Hazard

Working Near Boat Traffic & Moorings

Control: Maintain awareness of vessel movements in the marina and use appropriate signage or barriers around the work area.

Initial Risk: HighResidual Risk: Low
Hazard

Electrical Safety of Marina Power/Lighting Systems

Control: Isolate and lock off marina electrical supplies before working on pontoon-mounted power or lighting systems, testing dead before connection.

Initial Risk: HighResidual Risk: Low

Required PPE

Buoyancy AidNon-Slip FootwearBS EN 166 Safety GlassesWork GlovesHi-Vis Clothing

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover the risk of falling into the water while working on pontoons?

Yes. It includes a control requiring a buoyancy aid when working near the water's edge, with life rings and rescue equipment kept accessible throughout.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00