Ramsforge

Grounds & External Estate Maintenance RAMS Generator (UK)

Create a site-specific RAMS for grounds and external estate maintenance work, covering machinery and public access hazards, in under 2 minutes.

✓ Site-Specific RAMS

Applicable Regulations

PUWER 1998Manual Handling Operations 1992COSHH Regulations 2002

Method Statement — Sequence of Work

  1. Review this RAMS and confirm site conditions match those described before work begins.
  2. Brief all operatives on the hazards, controls and PPE requirements below (toolbox talk).
  3. Check and don all required PPE, and inspect tools and equipment before use.
  4. Carry out the task in line with the control measures set out in the Hazard & Risk Assessment section below.
  5. Maintain good housekeeping throughout — keep the work area tidy and manage waste and materials safely.
  6. On completion, remove tools and equipment, restore the work area, and report any incidents, near misses or changes in site conditions to the site supervisor.
  7. Complete the sign-off section at the end of this document before leaving site.

Hazard & Risk Assessment

Each hazard is assessed against a standard Likelihood × Severity matrix. “Initial Risk” reflects the risk before any control measures are applied; “Residual Risk” reflects the risk once the stated controls are correctly implemented on site.

Hazard

Power Tool & Machinery Use (Mowers, Strimmers, Hedge Cutters)

Control: Use only guarded, well-maintained equipment appropriate to the task, and check the area for debris and members of the public before starting.

Initial Risk: HighResidual Risk: Low
Hazard

Public Access During Grounds Work

Control: Use cordon tape or signage around active work areas on estates with public or staff footfall, particularly when using strimmers or hedge cutters.

Initial Risk: HighResidual Risk: Low
Hazard

Exposure to Herbicides & Fertilisers

Control: Follow the COSHH data sheet for all chemicals applied, and observe the specified re-entry period before the treated area is reopened to staff or the public.

Initial Risk: HighResidual Risk: Low
Hazard

Manual Handling of Grounds Equipment & Materials

Control: Use correct lifting technique and mechanical aids where possible for heavy mowers, equipment and bagged materials.

Initial Risk: HighResidual Risk: Low
Hazard

Working Near Water Features & Ponds

Control: Assess the risk of falling into water features before working near pond or lake edges, using appropriate barriers or supervision.

Initial Risk: HighResidual Risk: Low

Required PPE

BS EN 166 Safety GlassesHearing ProtectionCut-Resistant GlovesBS EN ISO 20345 Safety BootsHi-Vis Clothing

Emergency Procedures

Fire

Stop work immediately, raise the alarm and evacuate to the designated assembly point. Do not attempt to fight a fire beyond your training. Call 999 once safely evacuated if the fire brigade has not already been alerted.

First Aid / Injury

Stop work and alert the nearest first aider or site supervisor. For a serious injury, call 999 immediately and do not move a casualty unless there is immediate danger.

Spillage / Environmental Incident

Stop work, contain the spill using the site's spill kit if safe to do so, and report it to the site supervisor immediately. Do not allow any spillage to enter a drain or watercourse.

Emergency Services:999
Site Supervisor / Contact:
Nearest A&E:

Frequently Asked Questions

Does this RAMS cover public access during grounds maintenance work?

Yes. It includes a control requiring cordon tape or signage around active work areas on sites with public or staff footfall.

Do I need to keep a copy of this RAMS on site?

Yes. HSE guidance expects a copy of the RAMS — along with the completed sign-off section — to be available on site for the duration of the work, and reviewed if site conditions change.

Get this as a personalised, watermark-free PDF for your job.

Generate my RAMS — £15.00