Applicable Regulations
LOLER 1998PUWER 1998Manual Handling Operations 1992
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazard
Crane & Container Lifting Operations
Control: Plan every lift in line with a documented lifting plan, using tested and certified lifting gear, with a clear exclusion zone beneath suspended loads.
Also covered in the full document:
- Vehicle & Plant Movement on the Quayside
- Falls into Water from the Quay Edge
- Manual Handling of Cargo & Lashing Equipment
- Weather Conditions Affecting Lifting Operations
Frequently Asked Questions
Does this RAMS cover the risk of falling into the water from the quay edge?
Yes. It includes a control requiring edge protection or marked exclusion zones along the quay, with lifebuoys and rescue equipment kept accessible at regular intervals.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download