Applicable Regulations
Manual Handling Operations 1992Health and Safety at Work etc. Act 1974Lifting Operations and Lifting Equipment Regulations 1998 (LOLER)
Hazard & Risk Assessment
Every hazard in the full document has a control measure and a risk rating before and after controls. Here is one example in full.
Sample hazard
Injury from Incorrect Moving & Handling Technique
Control: Complete a person-specific moving and handling plan before any transfer, and only use techniques and equipment (hoists, slings) that staff are trained and assessed as competent to use.
Also covered in the full document:
- Hoist or Sling Equipment Failure
- Resident/Patient Falls During Transfer
- Manual Handling in Confined Domestic/Bedroom Spaces
- Challenging Behaviour During Personal Care
Frequently Asked Questions
Does this RAMS cover the LOLER inspection requirements for hoists and slings?
Yes. It includes a control requiring hoists and slings to be within their LOLER inspection date and visually checked before every use, with suspect equipment taken out of service immediately.
In the full document
- The control measure for each of the 5 hazards
- Required PPE list for this job
- A step-by-step method statement
- Emergency procedures & contacts
- A sign-off section, as a clean PDF — emailed to you and ready to download